Latest articles

Kempower to become preferred partner of CPO Allego in Europe

Primary charging point operator Allego has chosen Kempower to support its mission of delivering reliable, high-performance EV charging solutions across Europe. Kempower’s and Allego’s collaboration follows a series of successful pilot projects between the two companies since 2023 in the Netherlands,...

Megawatt charging, Kempower to ship up to 1.2 KW of power

The 1.2 MW MORE Power solution is modular, and existing Kempower DC fast-charging fields can be upgraded in terms of both power and number of charging outputs. Kempower is currently preparing a design guide to support customers and partners in expanding their charging infrastructure.

Highlights

Infrastructure

Milence announces second truck charging hub in Sweden

The new charging hub is situated on a 10,000 sqm plot in Ödeshög, a prime location 260 km from Stockholm and 350 km from Malmö along the heavily trafficked E4 motorway. This hub is next to a number of important facilities and a new logistics center is under construction nearby, enhancing its strateg...

Siemens successfully tested its 1 Megawatt charging system

MCS charging can successfully contribute towards sustainable long-distance transport for heavy-duty vehicles. To drive further progress in the sustainable transformation of this high emitting transport sector, Siemens has introduced a prototype of the SICHARGE Megawatt Charging System.

Milence to develop new electric charging hub in Varberg, Sweden

Varberg is located between Gothenburg and Malmö in the south-west of Sweden. The city itself is a popular stop off point for haulers and heavy-duty vehicle drivers, and the charging hub holds a strategic position near exit 55 along the E6 motorway. Milence's project will have two different phases.
  1. Back
  2. 1
  3. 7
  4. 8
  5. 9
  6. 10
  7. 11
  8. 22
  9. Next