Latest articles

WattEV adds megawatt chargers at its San Bernardino depot

The above mentioned depot now has 11.5 MW of total charging capacity, 30 250kW CCS ports, and six 1.2MW MCS ports added to its existing 24 ports. “WattEV’s vertically integrated approach is what truly sets us apart in the charging and fleet electrification sector,” said CEO Salim Youssefzadeh.

Let’s get familiar with GIGA (Green Industrial Grids Association)

The association has been created "to support a fundamental transformation of Europe’s power system by accelerating the development of modern and digital electricity grids". GIGA’s members include Amazon, Electra, Fastned, Google, Hitachi Energy, Linde, Meta, Metlen, Milence, Microsoft and Siemens En...
News

Highlights

recharging infrastructure

The video of the Tesla Semi charging batteries at 1.2 MW

The video, which appeared on the official Tesla X account, does not show any other details, such as the initial charge status, nor does it show whether the peak power is maintained for a long period of time. In any case, it is an important sign of technological developments in the charging infrastru...

Charging infrastructure, eight major players set new association in Germany

ABB E-mobility, Alpitronic, Aral pulse / bp, Electra, ENGIE Vianeo, Fastned, IONITY, and Shell have recently founded a new association in Germany. The Verband e-Mobility Deutschland e.V. (i. Gr.) (e-Mobility Association Germany) has the main target to "contribute constructively to policy discussions...
News
  1. Back
  2. 1
  3. 2
  4. 3
  5. 4
  6. 29
  7. Next