Latest articles

WattEV adds megawatt chargers at its San Bernardino depot

The above mentioned depot now has 11.5 MW of total charging capacity, 30 250kW CCS ports, and six 1.2MW MCS ports added to its existing 24 ports. “WattEV’s vertically integrated approach is what truly sets us apart in the charging and fleet electrification sector,” said CEO Salim Youssefzadeh.

Let’s get familiar with GIGA (Green Industrial Grids Association)

The association has been created "to support a fundamental transformation of Europe’s power system by accelerating the development of modern and digital electricity grids". GIGA’s members include Amazon, Electra, Fastned, Google, Hitachi Energy, Linde, Meta, Metlen, Milence, Microsoft and Siemens En...
News

Highlights

recharging infrastructure

Milence inaugurates first electric truck charging hub in Italy

The opening of the hub in Italy is the thirteenth to be operational in the Milence network. There, the company confirmed its target to have 1,700 charging points in operation in Europe by 2027. Milence’s hubs are equipped with some of the highest power outputs available today, offering 400 kW throug...
  1. Back
  2. 1
  3. 6
  4. 7
  5. 8
  6. 9
  7. 10
  8. 29
  9. Next