Latest articles

Mercedes-Benz keeps testing MCS-ready eActros 600 trucks

As stated by the truck maker, "the objective of the test drive was to ensure the highest possible compatibility between the vehicle and megawatt charging stations from various manufacturers, while also gathering valuable insights into the real‑world performance of megawatt charging under winter cond...

Highlights

recharging infrastructure

Milence announces second truck charging hub in Sweden

The new charging hub is situated on a 10,000 sqm plot in Ödeshög, a prime location 260 km from Stockholm and 350 km from Malmö along the heavily trafficked E4 motorway. This hub is next to a number of important facilities and a new logistics center is under construction nearby, enhancing its strateg...

Siemens successfully tested its 1 Megawatt charging system

MCS charging can successfully contribute towards sustainable long-distance transport for heavy-duty vehicles. To drive further progress in the sustainable transformation of this high emitting transport sector, Siemens has introduced a prototype of the SICHARGE Megawatt Charging System.

Milence to develop new electric charging hub in Varberg, Sweden

Varberg is located between Gothenburg and Malmö in the south-west of Sweden. The city itself is a popular stop off point for haulers and heavy-duty vehicle drivers, and the charging hub holds a strategic position near exit 55 along the E6 motorway. Milence's project will have two different phases.
  1. Back
  2. 1
  3. 14
  4. 15
  5. 16
  6. 17
  7. 18
  8. 30
  9. Next